Rauma-class missile boat
தோற்ற நாடு
பின்லாந்து
இன்னும் மொழிபெயர்க்கப்படவில்லை — ஆங்கிலத்தில் காட்டப்படுகிறது.
The Rauma-class missile boats (Finnish: Rauma-luokan ohjusvene) are a class of missile boat in use by the Finnish Navy.
It is the predecessor of the Hamina-class missile boats. The ships were constructed at the Rauma shipyard (initially by Hollming and after the merger Finnyards) in Rauma, Finland. All the ships have their home port in Pansio.
All four vessels underwent a 70 million EUR modernization program at the Western Shipyard in Teijo. The program includes the installation of a new version of the 9LV225 control and command system made by SAAB (the Mk.3 has been replaced by a Mk.4), the replacement of the Mistral SAM missiles with a MASS decoy system. The MASS system also replaces the Philax chaff and IR flares, the Thales Matilda radar warning system, and the six 103 mm rails for rocket illuminants, that were previously fitted. The sonar and ASW systems are being completely renewed (the previous Simrad ST 240 has been replaced by a ST2400). The modernization programme began late in 2010 with all four vessels expected to be ready by autumn 2013. The first vessel, Naantali, was handed over to the Finnish Navy in May 2013. The modernization will allow the vessels to be operational...
It is the predecessor of the Hamina-class missile boats. The ships were constructed at the Rauma shipyard (initially by Hollming and after the merger Finnyards) in Rauma, Finland. All the ships have their home port in Pansio.
All four vessels underwent a 70 million EUR modernization program at the Western Shipyard in Teijo. The program includes the installation of a new version of the 9LV225 control and command system made by SAAB (the Mk.3 has been replaced by a Mk.4), the replacement of the Mistral SAM missiles with a MASS decoy system. The MASS system also replaces the Philax chaff and IR flares, the Thales Matilda radar warning system, and the six 103 mm rails for rocket illuminants, that were previously fitted. The sonar and ASW systems are being completely renewed (the previous Simrad ST 240 has been replaced by a ST2400). The modernization programme began late in 2010 with all four vessels expected to be ready by autumn 2013. The first vessel, Naantali, was handed over to the Finnish Navy in May 2013. The modernization will allow the vessels to be operational...






